Mobile Device Charger e-Kiosk: collaborative engineering and ‘turn-key’ production

THE CHALLENGE
A fast time-to-market of a turn-key E-KIOSK, with collaborative engineering, electronic integration, and logistics services

Collaborative Engineering
Optimized Surface Treatment
Competitive processes – assembling and manufacturing
Logistic Service

Fast design for manufacturing, 5 weeks from idea to first series production.
Competitive labor cost in the assembly line.
Packaging design.

 

 

 

More info