Parking System fully developed and produced at MCG
THE CHALLENGE
Develop and prototype a turn-key e-kiosk parking system project (end to end contract manufacturing).
PROJECT STRENGTHS
Collaborative Engineering
Permanent work with the customer for the manufacture of functional prototypes for validation and all metal forming technology. Design and innovative development of invisible and inviolable from the outside interior hinges.
Welding Engineering
Design, fabrication and inspection of welded joints. Welding fixtures design and all the process steps.
Optimized Surface Treatment
Expert advising on the use of the most suitable raw materials and surface treatment, including finishing.
Competitive processes
The optimization of the assembly lines and the production in batches allow to reduce in two weeks the term of execution. Logistics system and delivery of products already tested and ready to work.